Fill Dirt Calculator
Find how much fill dirt you need to raise grade, backfill a hole or level a low spot. Enter the area and depth to get cubic yards and tons, with a compaction allowance.
Fill dirt needed
Assumes ~1.2 tons per cubic yard. Compaction allowance covers settling once the fill is tamped.
How to calculate fill dirt
Fill dirt is estimated by volume, the same way as topsoil or gravel: area in square feet multiplied by depth in feet (depth in inches ÷ 12), divided by 27 for cubic yards. The formula is cubic yards = area (ft²) × depth (in) ÷ 12 ÷ 27. Fill dirt is typically sold and delivered by weight, and because it is usually a sandy or clay subsoil with little organic matter, it runs a bit denser than topsoil at roughly 1.2 US tons per cubic yard.
Fill dirt vs topsoil
Fill dirt is bulk subsoil used to raise low areas, backfill around a foundation, fill in an old pool or pond, or build up grade before a structure goes in. It is not intended to support plant growth and is usually cheaper than topsoil. Topsoil is the nutrient-rich, organic-heavy surface layer meant for lawns and planting. A common approach is to bring a site up to rough grade with fill dirt, then cap it with 4 to 6 inches of the topsoil calculator's output before seeding or planting.
Compaction changes the math
Loose fill dirt settles noticeably once it is spread, watered and compacted, more so than most other materials on this site. For anything structural, a shed pad, a driveway base or fill that will carry a building, place it in 6 to 8 inch lifts and compact each lift before adding the next, rather than dumping the full depth at once and compacting only the top. Budget 10 to 15 percent extra volume to account for this settling, more for deep fills or looser native soil.
When fill dirt isn't the right material
If the project needs load-bearing stability under a slab, driveway or patio, compacted gravel or crushed stone is usually the better choice over plain fill dirt, since it compacts to a denser, more predictable base and drains better. Use fill dirt for bulk grading and low spots, and the gravel calculator or crushed stone calculator for the structural base layer itself.